Chesapeake Energy is pleased to be active in Southeast Arlington. We have obtained three drilling permits for wells on this site with the City of Arlington. The High Point padsite is located on East Arbrook Blvd. on High Point Church’s property. During the three or four days that equipment is brought to the site, you may witness increased traffic around the area. Drilling activity on the well will last approximately three weeks.
Chesapeake has completed drilling the first well, the High Point 1H, and we will return at a future date to drill the two additional wells that have been permitted through the City of Arlington. We have recently submitted paperwork to the city requesting a fourth drilling permit on this padsite for the High Point 4H.
Go to Top
- 10/20/2008 - Approximate date for the drilling rig to move onto the padsite.
- 10/23/2008 - Approximate date to begin drilling the High Point 1H.
- 06/2009 - Approximate date to begin drilling the High Point 2H as
currently scheduled.
- 07/2009 - Approximate date to begin drilling the High Point 3H as
currently scheduled.
- 08/2009- Approximate date to begin drilling the High Point 4H as
currently scheduled.
Go to Top
For an aerial of the High Point padsite and truck route, please click the images below:


Go to Top
Please contact Chesapeake regarding questions or concerns you might have about natural gas drilling and operations in your neighborhood. Contact us at AskChesapeake@chk.com or call 817.502.5000. You will be contacted within 48 hours by one of our Neighbor Relations Specialists.
Go to Top